Owner: City of Bellingham
Contract Price: $3 million
Project Length: .5 miles
Functional Class: Arterial Collector
Greenroads Score: Silver
Greenroads Rating: 43 (Version 1.5)
Designer: KPFF
Contractor: RAM of Bellingham
The $3 million project replaced two 95-year-old timber bridge structures with a single, 80-foot concrete span with one lane in each direction, dedicated lanes for bikes and sidewalks for pedestrians. The bridge, which carries nearly 12,000 vehicles each day, is now removed from the flood plain.
Crews used recycled content and warm mix asphalt in the approaches.The approaches include a center turn lane. Crews also build access and parking for Sunset Pond Park. Project managers are not only proud of the bridge, but also the new, rechanneled Squalicum Creek.
The rechanneled the creek which now flows under the new bridge improves environmental connectivity and increase salmon habitat. It’s really spectacular at high water.