Owner: California Department of Transportation
Funders/Stakeholders: California Department of Transportation, Federal Highway Administration (TIGER), San Francisco County Transportation Authority (SFCTA), Presidio Trust, City of San Francisco
Lead Design: ARUP/PB Joint Venture
Contractors: CC Myers, Ghilloti Bros., Malcolm Drilling
Functional Class: Major Arterial
Greenroads Version: v1.5
The Presidio Parkway Project is a 1.6 mile, $1.045 billion dollar, multi-phased corridor reconstruction project built over six years to improve a structurally and seismically deficient roadway of historic Doyle Drive. Construction on Phase I ($496.3 million) began in 2009 and rebuilt the southern access to the Golden Gate Bridge (Doyle Drive).
This Project started out with Greenroads as a Pilot Project, and opted in to the Certification process after receiving the results. Ruckman Bridge Replacement was one of three successfully Certified components.
Watch a time-lapse video of the Ruckman Bridge Replacement Project's construction.