Greenroads Certified Silver

Wapato Lake Drive

 

Summary

Owner: City of Tacoma, WA

Allocated Construction Cost: $1.15 million

Funders/Stakeholders: City of Tacoma Environmental Services, Washington Department of Ecology, Tacoma Water

Design: City of Tacoma

Contractor: Miles Resources

Functional Class: Local

Length: 0.25 miles (0.50 lane-miles)

Greenroads Version: v1.5

Description

The Wapato Lake Drive project included the removal and replacement of an existing roadway with permeable pavement.  The road serves a residential area adjacent to Wapato Lake Park.  Many sustainable street improvments were included between South 56th St. and South 72nd Street to create a more environmentally friendly pedestrian link to Wapato Lake Park.  The project included non-invasive and native planting, LED lighting with non-light polluting fixtures, as well as runoff flow control and runoff quality treatment. This is the city of Tacoma's fourth certified project and the highest scoring project to date.

 

Paving the new permeable roadway

Close up of permeable pavement

New curbs