PT-2: Permeable Pavement
3 points
Goal
Improve flow control and quality of stormwater runoff
through use of permeable pavement technologies.
Requirements
Use a permeable (porous) pavement or pavers to control and treat at least 50% of the
90th percentile average annual rainfall event post-construction runoff volume to 25
mg/L concentration of total suspended solids (TSS) or less.
Documentation
- Copy of the drainage or hydrology report and supporting calculations showing
treatment area and percent treatment achieved. This document may be included as
part of the submittal requirements for PR-8 Low Impact Development, but relevant
permeable pavement calculations, areas, and treatment levels should be
highlighted for this credit.
- Copy of the permeable pavement mix design. The mix design should have the
following items highlighted:
- Name of permeable technology, if used (e.g. pavers, turf, etc.)
- Total tons of pavement on the project, including portland cement concrete and
asphalt concrete (hot, warm and cold mix)
- Total air voids in the mix (or manufacturer-tested voids specifications for pavers
based on method of installation)
- Total tons of permeable pavement used
- Copy of the maintenance plan in-place for the permeable pavement(s).
- Photo of the permeable pavement(s) installed on the project.
Public commentary on credit PT-2
No comments have been posted on this part of the manual yet.
Greenroads Manual Review []
You must be logged in to the Greenroads website in order to post comments on the manual. If you already have an account, please log in using the green login box in the upper right portion of the screen. If you do not have an account but wish to comment, please sign up for one here.
Thanks,
The Greenroads Team