EW-5: Site Vegetation
1-3 point
Goal
Promote sustainable site vegetation that does not require irrigation.
Requirements
Site vegetation shall be subject to the following requirements in order to receive the
points listed:
- 1 point: Use non-invasive plant species only
- 1 point: Do not use water (no irrigation) after the plant establishment period
- 1 point: Use native plant species only
Documentation
- A vegetation or landscape plan showing type and location of all plant species. This
can often be found in the standard project plans.
- The specification sections relating to site vegetation including planting bed
requirements. These are typically found in the technical specifications.
- A copy of or reference to (e.g., web address) the policy or procedure used to select
plant species.
Public commentary on credit EW-5
No comments have been posted on this part of the manual yet.
Greenroads Manual Review []
You must be logged in to the Greenroads website in order to post comments on the manual. If you already have an account, please log in using the green login box in the upper right portion of the screen. If you do not have an account but wish to comment, please sign up for one here.
Thanks,
The Greenroads Team