PR-5: Noise Mitigation Plan
Goal
Reduce or eliminate annoyance or disturbance to surrounding neighborhoods and
environments from road construction noise.
Requirements
Establish, implement, and maintain a formal Noise Mitigation Plan (NMP) during
construction for the prime contractor. The NMP must address, at minimum, the
following elements:
- Responsible party for noise mitigation activities, contact information, their
responsibilities and their qualifications. Include information for NMP preparer, if
applicable or completed by an outside party.
- Project location and distance to closest receptor of noise. Include a description of
the surrounding zoning and parcel information (i.e., commercial, residential,
hospitals, schools, parks, sensitive habitat).
- A list of proposed construction activities (e.g. demolition, excavation, paving, bridge
foundations, finishing).
- Dates and working hours of proposed construction activities.
- A list of noise-generating devices used during each construction activity listed in #3.
- A list of noise-mitigating devices used during each construction activity listed in #3,
including personal safety equipment requirements for all site employees.
- Noise permit numbers, agency or local authority policies associated with
construction work, as applicable.
- Description of noise monitoring standards, methods, and acceptable levels.
- Description of correction procedures for non-compliant noise levels.
- Signature of responsible party.
Documentation
- Copy of the Noise Mitigation Plan.
- A copy of any applicable noise permits, or agency or local authority noise policies (a
live hyperlink to any large policy documents is sufficient).
Resources
Construction Noise Mitigation Plan Form
Public commentary on credit PR-5
No comments have been posted on this part of the manual yet.
Greenroads Manual Review []
You must be logged in to the Greenroads website in order to post comments on the manual. If you already have an account, please log in using the green login box in the upper right portion of the screen. If you do not have an account but wish to comment, please sign up for one here.
Thanks,
The Greenroads Team