PR-7 Pollution Prevention Plan (pdf 157 kb)

Greenroads Manual

PR-7: Pollution Prevention Plan

Goal

Reduce pollution and associated effects from construction activities.

Requirements

Create and implement a comprehensive Stormwater Pollution Prevention Plan (SWPPP) or Temporary Erosion and Sedimentation Control (TESC) plan that conforms to the requirements of the current Environmental Protection Agency (EPA) Construction General Permit OR the local or state Construction General Permit in areas that manage their own permitting plan, whichever is more stringent. The SWPPP/TESC must address water quality control and dust control activities used during construction of the roadway project.

Documentation

Copy of the Stormwater Pollution Prevention Plan (SWPPP) or Temporary Erosion and Sedimentation Control Plan (TESC) signed by the certified Erosion and Sediment Control inspector or authorized specialist for the project upon completion of construction.

 

Browsing the Manual

You may also want to Comment on the manual or Rate a project.

powered by webkey

1457